Production: Not Proved Adequate
The Navy moved in on Brewster Aeronautical Corp. last week, seized Brewster's two plants in Long Island City (where it manufactures dive-bomber parts), its big, new, final assembly plant in Johnsville, Pa. (where it is supposed to be zipping out finished planes) and its plant at Newark Airport (where it makes wingtip floats and other gear for Consolidated Catalina Flying Boats). Brewster was the fifth U.S. firm to be seized by the Government since war began in Europe.*
The others had all been taken over in the midst of their labor wrangles,...
To read the entire article, you must be a TIME subscriber. Already registered? Sign in below
Current print subscribers to register
Subscribe now to get TIME All Access
Email, Password or Region is incorrect
A required form parameter was missing.
The System is currently down. Please try again in a few minutes.
Email Address is invalid
Password is blank
Most Popular »
- Icelanders Avoid Inbreeding Through Online Incest Database
- The 2012 World Press Photo of the Year
- Top 10 Celebrity Restaurants
- Why American Kids Are Brats
- A Cancer Drug Reverses Alzheimer's Disease in Mice
- Jimmy Stewart: A Hero Home From the War
- The Second Coming of Warren Jeffs: The Jailed Polygamist Leader Prepares His Flock for Doomsday
- Why Is Your Boss Moving to Brazil?
- The Foreclosure Deal: Obama and the Banks Win Big While Homeowners See Modest Reward
- Who Qualifies for the $26 Billion Foreclosure Settlement?
- Why Is Your Boss Moving to Brazil?
- The Upside Of Being An Introvert (And Why Extroverts Are Overrated)
- The Second Coming of Warren Jeffs: The Jailed Polygamist Leader Prepares His Flock for Doomsday
- Why Mario Monti Is the Most Important Man in Europe
- Friends With Benefits
- Lessons Unlearned: Why Another Gigantic Famine Looms in Africa
- Companies Are the New Countries
- Seoul Searching
- New York City: 10 Things to Do
- Why It's Time to Replace No Child Left Behind




