Environment: A Lemon Named Big Allis
Almost exactly a year ago, the Consolidated Edison supergenerator known as "Big Allis" short-circuited, melting her metal insides and reducing Con Ed's electric power supply to New York City by 14%. "Brownouts" followed reductions of power that dimmed lights and left New Yorkers chagrined. Con Ed engineers toiled on the generator, built by Allis-Chalmers, round the clock. After six months and 80,000 man-hours of work, Big Allis was "on line." But not for long. Within 87 minutes she conked out for four more months.
Tripping Out. Last week, after only 35 days of operation, Big Allis in the jargon of power engineers...
Email, Password or Region is incorrect
A required form parameter was missing.
The System is currently down. Please try again in a few minutes.
Email Address is invalid
Password is blank
Most Popular »
- Foo Fighters and Adele Win Big at Grammys
- 2012 Grammys Red Carpet: Six OMG Fashion Moments
- The Best and Worst of the 2012 Grammys
- The Greeks Pass Austerity But Are They Being Priced Out of Their Lives?
- The Voice: Whitney Houston (1963-2012)
- It's Official: Linsanity Is for Real
- Deodorizing Denim: Scratch and Sniff Men's Jeans Debut in Canada
- Eat like an Italian
- Why American Kids Are Brats
- Whitney Houston: A Life in Photos
- The Upside Of Being An Introvert (And Why Extroverts Are Overrated)
- Foo Fighters and Adele Win Big at Grammys
- Warren Buffett Is on a Radical Track
- Eat like an Italian
- Sentencing Spain's 'Superjudge': Why Baltasar Garzón Is Being Punished
- Argentina and Britain's Unfinished War: Hate E-Mail, Harassing Calls and Prince William
- Between Lots of Rocks and Hard Places: Greece's Bad Options
- Friends With Benefits
- Can China Successfully Educate Its Future Workforce?
- In Greece, the Growing Shadow of the Dreaded Drachma




